Tower 751 Gibson Burch Kellum and Bede ran the Task Force assignment on Box 23-2 as the 4th due truck. The tower arrived in staging and was advised to find away to get to side c and step up for Master Stream Operations. The tower had to go around the block and in between two buildings to gain access to side C. The tower set up on the corner of sides c d. Once the tower was in place over the building it could be seen that the part of roof had collapsed in quadrant D. This is the same area the bulk of the fire was. Once the water supply was established the tower flowed over 900gpm of water for about 2 hours before being placed in service by command.
